top of page

CENTRALIZED OIL FACILITY & PIPELINE

B3 represents the most recent of seven similar projects in the Kurdistan Region of Iraq, all at various stages of investigation, construction, and production, for which RVFLimited has completed or is currently completing this type and magnitude of work. 

The B3 project, executed in the Kurdistan Region of Iraq, consisted of the full design and construction of a centralized oil facility involving various infrastructures including a truck staging pad, loading pad, tank farm, access roads, and transfer pipeline.  This project required a pre-construction survey utilizing drone technology prior to our designers creating this facility in AutoCAD.

 

RVFLimited managed all civil activities including earthworks, geotechnical investigations and remediation, concrete works and testing, and utility installation. The customer was provided a handover package with all documentation verifying as-builts and testing.

bottom of page